The project mapped out
| Dispensary | |
| School building | |
| Pump house / Borehole | |
| Water storage tank | |
| Distribution point (DP) | |
| Water pipeline | |
| Main road | |
| Seasonal river |
PHASE 0
| What | Pilot Study – Geologic Survey |
|---|---|
| Cost | € 1,000 |
| Status | Finished |
PHASE 1
| What | Drilling |
|---|---|
| Depth | 135 m |
| Date | November 2016 |
| Cost | € 26,000 |
| Status | Finished |
PHASE 2
| What | Connection existing distribution network |
|---|---|
| Length | 1.5 km |
| Date | March 2017 |
| Cost | € 13,000 |
| Status | Finished |
PHASE 3
| What | Topographical survey |
|---|---|
| Date | April 2017 |
| Cost | € 1,000 |
| Status | Finished |
PHASE 4
| What | Installation Pump & Pump housing |
|---|---|
| Date | May 2017 |
| Cost | € 32,000 |
| Status | Finished |
PHASE 5
| What | Construction new storage reservoir |
|---|---|
| Volume | 100 m³ |
| Height | 1,511 m |
| Cost | € 19,000 |
| Status | Finished |
PHASE 6
| What | Connection pump - new storage tank |
|---|---|
| Length | 1.7 km |
| Cost | € 20,000 |
| Status | Finished |
PHASE 7
| What | Extension Lambo/Kanisa + 4 DPs |
|---|---|
| Length | 2.5 km |
| Cost | € 20,000 |
| Status | Finished |
PHASE 8
| What | Extension Mwalimu Marco + 4 DPs |
|---|---|
| Length | 2.7 km |
| Cost | € 20,000 |
| Status | Finished |
PHASE 9
| What | Extension Charles Umbe en Darabe Awaki + 2 DPs |
|---|---|
| Length | 2.9 km |
| Cost | € 13,000 |
| Status | In progress |






Phase 11: Connection of storage tank ‘Vodacom’ to the existing network of ENDAWASU. The storage tank is connected to the existing ENDAWASU network via a pipeline of 800 meters. In this way, overproduction on the ENDAWASU network via the new storage tank is efficiently channeled to the new distribution lines.


Phase ‘Party’: On 4 January 2019 – a little bit premature – we celebrated. An extensive delegation from Misingi traveled to Endallah (at their own expense) to officially transfer MAJI I and II to the community. Celebrating with dancing and … speeches! Whoever has not seen it, can not possibly imagine what was realized here and what a difference this makes for the people of Endallah. After 2.5 years of hard work we (Tanzanian workers and ‘influencers’ and white fundraisers) can look back with some pride for what we have accomplished!